{"url":"https://dtkcanuck.hatenablog.com/entry/2024/03/31/014036","type":"rich","image_url":"https://cdn-ak.f.st-hatena.com/images/fotolife/d/dtkcanuck/20240331/20240331011159.jpg","author_name":"dtkcanuck","categories":[],"version":"1.0","published":"2024-03-31 01:40:36","blog_url":"https://dtkcanuck.hatenablog.com/","author_url":"https://blog.hatena.ne.jp/dtkcanuck/","provider_name":"Hatena Blog","description":"So, this was the last stretch as far as assembly work went; the anchors were attached, the plane handling crane was put in place, small davits were attached, the mainmast was rebuilt, miscellaneous small pieces were glued in place, and the top of the forward tower mast was put in place. After all th\u2026","blog_title":"Paddler with No Water (Blog II)","height":"190","width":"100%","provider_url":"https://hatena.blog","html":"<iframe src=\"https://hatenablog-parts.com/embed?url=https%3A%2F%2Fdtkcanuck.hatenablog.com%2Fentry%2F2024%2F03%2F31%2F014036\" title=\"1/700 Dunkerque - Build Report 7 - Paddler with No Water (Blog II)\" class=\"embed-card embed-blogcard\" scrolling=\"no\" frameborder=\"0\" style=\"display: block; width: 100%; height: 190px; max-width: 500px; margin: 10px 0px;\"></iframe>","title":"1/700 Dunkerque - Build Report 7"}